Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   - 3.1.1.2. Technical characteristics
      3.1.1.3. Sinkhronizatsionnye of a gazoraspredeleniye label
      3.1.1.4. Compression check
      3.1.1.5. Gas-distributing belt
      3.1.1.6. Natyazhitel of a gas-distributing belt, asterisk
      3.1.1.7. Additional driving belts
      3.1.1.8. Camshaft cover
      3.1.1.9. Camshaft epiploon
      3.1.1.10. Epiploon of an intermediate shaft
      3.1.1.11. Epiploons of a cranked shaft
      3.1.1.12. Head of cylinders
      3.1.1.13. Hydraulic pushers
      3.1.1.14. Flywheel
      3.1.1.15. Engine fastenings
      3.1.1.16. Oil pallet
      3.1.1.17. Oil pump and maslozaborny branch pipe
   + 3.1.2. 5-cylinder engines
   + 3.1.3. 6-cylinder engines
+ 3.2. Diesel engines
+ 3.3. Removal and partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. Exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, steering
+ 12. Body
+ 13. Electric equipment
+ 14. Good advice


ff85f19c

3.1.1.14. Flywheel

Removal

PERFORMANCE ORDER
1. In models with a mechanical transmission remove a transmission and coupling.
2. In models with an automatic box remove a transmission.
3. Unscrew flywheel bolts, previously having stopped it.
4. Remove a flywheel.

Check

PERFORMANCE ORDER
1. Check a flywheel on existence of wear and damages. At detection of those, address to the expert.
2. If you establish a new flywheel, on it there is only a label for N1 piston installation in VMT. It will be necessary for you to put on it a label for installation of a corner of an advancing of ignition (and = 14,6 mm).
3. Examine the needle bearing of a cranked shaft.

Installation

Installation is made in sequence, return to removal.

PERFORMANCE ORDER
1. Put pressurizing structure on flywheel bolts.
2. Establish a leading disk (and = 27 mm of ± 1 mm).
3. Tighten flywheel bolts.