|
Audi 100/A61990-1997 of releaseRepair and car operation |
|
Audi 100/A6 + 1. Maintenance instruction + 2. Maintenance - 3. Engines - 3.1.1.2. Technical characteristics 3.1.1.3. Sinkhronizatsionnye of a gazoraspredeleniye label 3.1.1.4. Compression check 3.1.1.5. Gas-distributing belt 3.1.1.6. Natyazhitel of a gas-distributing belt, asterisk 3.1.1.7. Additional driving belts 3.1.1.8. Camshaft cover 3.1.1.9. Camshaft epiploon 3.1.1.10. Epiploon of an intermediate shaft 3.1.1.11. Epiploons of a cranked shaft 3.1.1.12. Head of cylinders 3.1.1.13. Hydraulic pushers 3.1.1.14. Flywheel 3.1.1.15. Engine fastenings 3.1.1.16. Oil pallet 3.1.1.17. Oil pump and maslozaborny branch pipe + 3.1.2. 5-cylinder engines + 3.1.3. 6-cylinder engines + 3.2. Diesel engines + 3.3. Removal and partition of engines + 4. Cooling system + 5. Heating and ventilation + 6. Fuel system + 7. Exhaust system + 8. Systems of start, ignition + 9. Transmission + 10. Brake system + 11. Suspension brackets, steering + 12. Body + 13. Electric equipment + 14. Good advice |
3.1.1.12. Head of cylindersADR ENGINEExternal details of a head of cylinders
Sequence of a tightening of bolts of a head of cylinders (ADR) Removal
Installation Installation is carried out upside-down. During carrying out installation replace all old laying new. The sequence of a tightening of bolts of a head is specified in drawing (see fig. Sequence of a tightening of bolts (ADR)). ALL ENGINES, EXCEPT ADR Sequence of a tightening of bolts of a head of cylinders (not ADR) Mark in the top party of laying Removal Installation
|
|