Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1.1.2. Technical characteristics
   - 3.1.2. 5-cylinder engines
      3.1.2.2. Technical characteristics
      3.1.2.3. Sinkhronizatsionnye of a gazoraspredeleniye label
      3.1.2.4. Compression check
      3.1.2.5. Gas-distributing belt
      3.1.2.6. Natyazhitel of a gas-distributing belt, asterisk
      3.1.2.7. Additional driving belt
      3.1.2.8. Camshaft cover
      3.1.2.9. Camshaft epiploon
      3.1.2.10. Epiploons of a cranked shaft
      3.1.2.11. Head of cylinders
      3.1.2.12. Hydraulic pushers
      3.1.2.13. Flywheel
      3.1.2.14. Engine fastenings
      3.1.2.15. Oil pallet
      3.1.2.16. Oil pump and maslozaborny branch pipe
   + 3.1.3. 6-cylinder engines
+ 3.2. Diesel engines
+ 3.3. Removal and partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. Exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, steering
+ 12. Body
+ 13. Electric equipment
+ 14. Good advice


ff85f19c


комментарии:
Редактор: Баженов Я. Э.
URL: "https://inixi.ru" видео порнуха
смотреть порно https://inixi.ru где, как тут кончают только в рот!

3.1.2.6. Natyazhitel of a gas-distributing belt, asterisk

Removal

PERFORMANCE ORDER
1. Disconnect a wire of the minus plug of the accumulator.

NATYAZHITEL

PERFORMANCE ORDER
2. Remove a gas-distributing belt.
3. Unscrew bolts and remove a natyazhitel.

CAMSHAFT ASTERISK

PERFORMANCE ORDER
4. Remove a gas-distributing belt.
5. Unscrew a bolt of an asterisk of a camshaft and remove an asterisk.

ASTERISK OF THE CRANKED SHAFT

PERFORMANCE ORDER
6. Remove a gas-distributing belt.
7. Unscrew a bolt of an asterisk of a cranked shaft and remove an asterisk.

Check

PERFORMANCE ORDER
1. Clean asterisks and examine them on existence of wear and damages.
2. Examine a natyazhitel on existence of wear and damages, if necessary replace it.

Installation

Installation of all details is carried out upside-down removals.