Audi 100/A6 + 1. Maintenance instruction + 2. Maintenance + 3. Engines + 3.2. Diesel engines + 3.3. Removal and partition of engines + 4. Cooling system + 5. Heating and ventilation + 6. Fuel system + 7. Exhaust system - 8. Systems of start, ignition + 8.1.1. Introduction - 8.2. Ignition system (petrol engines) + 8.2.1.1. Principle of work of PMS 8.2.2. Technical characteristics 8.2.3. Check of system of ignition 8.2.4. Ignition coil 8.2.5. Ignition distributor 8.2.6. Corner of an advancing of ignition 8.2.7. Sensors of system of ignition 8.2.8. Begunok of the ignition distributor 8.2.9. Ignition system (6-cylinder engines 2,6 and 2,8 of l) 8.2.10. Diagnostics of malfunctions of system of injection of gasoline 8.2.11. That it is necessary to know to the owner of the car with the injector engine 8.2.12. Turbo doctor + 8.3. System of prestarting heating (diesel engines) + 8.4. System of production of exhaust gases + 9. Transmission + 10. Brake system + 11. Suspension brackets, steering + 12. Body + 13. Electric equipment + 14. Good advice
|
ADR ENGINE
PERFORMANCE ORDER |
|
1. Remove a casing. |
|
|
2. Press on the socket of connection of the coil and disconnect it. |
|
|
3. Turn off a fixing nut and disconnect a weight wire. |
|
4. Turn off fixing bolts. |
|
|
5. Disconnect wires from spark plugs of N1 and 2, remove the ignition coil, having disconnected the remained wires. |
|
Installation
Installation is carried out upside-down removals.
AAE, ACE AND ABK ENGINE
Removal
PERFORMANCE ORDER |
1. Disconnect wires from the ignition coil. |
2. Turn off fixing screws and remove the coil. |
|
Installation Installation is carried out upside-down removals.
AAR ENGINE
Removal
PERFORMANCE ORDER |
1. Disconnect wires from the ignition coil. |
2. Turn off a coupling bolt and remove the coil. |
|
Installation Installation is carried out upside-down removals. |
|