Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. Exhaust system
- 8. Systems of start, ignition
   - 8.1.1. Introduction
      8.1.2. Technical characteristics
      + 8.1.3. Accumulator
      - 8.1.4. Generator / system of additional charge of the accumulator
         8.1.4.1. Malfunctions of the generator
      8.1.5. Replacement of the holder of brushes and regulator of tension of the generator
      8.1.6. Check of system of start of the engine
      8.1.7. Starter
      8.1.8. Inlet gas pipeline
      8.1.9. Cable gas/lever of a butterfly valve (DB)
      8.1.10. Cable of management of gas (DB)
      8.1.11. Contour of fuel of the diesel engine
      8.1.12. Prestarting heating of diesel fuel
      8.1.13. Fuel thermostat
      8.1.14. Hydrovalve case
      8.1.15. Cable gas/lever of a butterfly valve (DD)
      8.1.16. Cable of management of gas (DD)
   + 8.2. Ignition system (petrol engines)
   + 8.3. System of prestarting heating (diesel engines)
   + 8.4. System of production of exhaust gases
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, steering
+ 12. Body
+ 13. Electric equipment
+ 14. Good advice


ff85f19c

8.1.4. Generator / system of additional charge of the accumulator

GENERAL INFORMATION

If the alarm bulb of system of ignition does not light up at ignition inclusion, check connecting wires, a bulb and a cartridge.

If the alarm bulb lights up at operation of the engine, muffle the engine and check a tension of a driving belt, connecting wires of the generator and a condition of the generator. Check a voltage stabilizer. If you could not find malfunction, address to experts.

Removal
PERFORMANCE ORDER
1. Remove a driving belt of the generator.
2. Disconnect wires from the generator.
3. Turn off the bottom fixing bolt and a nut (on AAT engines).
4. Turn off the top fixing bolt of the generator.
5. Remove the generator.

Installation

PERFORMANCE ORDER
Installation is carried out upside-down removals. Tighten fixing bolts till the demanded moment of an inhaling.