Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
- 6. Fuel system
   + 6.1.2. Technical characteristics
   + 6.2. Multipoint system of injection of fuel
   - 6.3. System of injection of MPI/MPFI (6-cylinder engines)
      6.3.2. Technical characteristics
      6.3.3. Distinctions of systems of injection
      6.3.4. Sensors
      6.3.5. Idling regulation
      6.3.6. Removal and installation of klapanny nozzles
      6.3.7. Check of klapanny nozzles
      6.3.8. Oxygen sensor
   + 6.4. Power supply system of diesel engines
   6.5. Device of service of heating
   6.6. Diagnostics of malfunctions of system of heating
   6.7. Conditioner: not only "pluses", but also "minuses"
   6.8. Rules of service of the conditioner
+ 7. Exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, steering
+ 12. Body
+ 13. Electric equipment
+ 14. Good advice


ff85f19c

6.3.6. Removal and installation of klapanny nozzles

GENERAL INFORMATION

SYSTEM OF INJECTION OF MPI/MPFI

System of injection of MPI


1. Returnable топливопровод
2. Bolt, 10 Nanometers
3. Coupling collar
4. Sealing ring
5. Pressure regulator
6. Fuel collector (ring топливопровод)
7. Delivery топливопровод
8. Lock bracket
9. Sealing ring
10. Klapanny nozzle. Resistance: 15–17 Ohm (omega big).
11. Sealing ring
12. A switched inlet collector

Prevention

Consolidations always replace.


Removal

PERFORMANCE ORDER
1. Remove a hose of inlet air between a measuring instrument mass to a consumption of air and a noise quencher.
2. Pull out at coils of ignition of a wire of a high voltage, unhook them from ring топливопровода and put aside.
3. Pull out tips at klapanny nozzles.
4. Turn on ring топливопровод from an inlet collector.
5. Pull out lock brackets of klapanny nozzles.
6. Lift ring топливопровод up.
7. Take out klapanny nozzles from an inlet collector.

Installation

PERFORMANCE ORDER
1. Klapannye nozzles with new sealing rings insert into an inlet collector. Previously sealing rings easily grease with pure engine oil.
2. Establish ring топливопровод.
3. Insert safety brackets of klapanny nozzles.
4. Tighten ring топливопровод to an inlet collector the moment of 10 Nanometers.
5. Insert tips of klapanny nozzles
6. Thrust wires of a high voltage in coils of ignition and attach them to ring топливопроводу.
7. Establish a hose of inlet air between a measuring instrument of a mass consumption of air and a noise quencher.