Repair and operation of the car of Audi 100/A6 - 11.4.3. Shock-absorbers of a forward suspension bracket//Audi of 100/A6 1990-1997 / t3r.ru

Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. Exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
- 11. Suspension brackets, steering
   11.2. Technical characteristics
   11.3. General description of adjustment of wheels
   - 11.4. Forward suspension bracket
      11.4.2. Rack of a forward suspension bracket
      11.4.3. Shock-absorbers of a forward suspension bracket
      11.4.4. Bottom lever of a forward suspension bracket
      11.4.5. Stabilizer of cross-section stability of a forward suspension bracket
      11.4.6. Cross-piece of a forward suspension bracket
   + 11.5. Back suspension bracket
   + 11.6. Steering
   + 11.7. Semi-axes
   11.8. Easily and easy
   11.9. Maintenance of system of a steering
   11.10. Diagnostics of malfunctions of system of a steering
+ 12. Body
+ 13. Electric equipment
+ 14. Good advice


ff85f19c
Êîãäà äðîæàò ðóêè

11.4.3. Shock-absorbers of a forward suspension bracket

Removal

PERFORMANCE ORDER
1. Mark the provision of installation of the top support of the shock-absorber on a plate of the top fastening of a rack of a suspension bracket.
2. Turn off and remove a nut on a rod of the piston of the shock-absorber.
3. Turn off three fixing nuts and remove the top support of the shock-absorber.
4. Turn a steering wheel so that the rod of the piston of the shock-absorber was in the opening center on the top fastening of a rack.
5. Remove the adjusting plug of the shock-absorber and a rubber emphasis.
6. Turn off a fixing cap and remove it.
7. Remove the shock-absorber.

Installation

Installation is carried out upside-down removals.

PERFORMANCE ORDER
1. Tighten a fixing cap till the demanded moment of an inhaling.
2. Establish the top support and twirl a fixing nut.
3. Establish washers and new fixing nuts.
4. Combine made before a mark and tighten fixing nuts.
5. Establish a casing into place an arrow outside.